How to create a Disaster Recovery plan for several machines

How to create a DR plan for several machines

Task

Create a DR plan for several machines

Solution

Check the boxes in front of those machines that you want to replicate. Click on the "Bulk actions" button, then select "Generate DR plan".

Genetare Disaster Recovery plan
    • Related Articles

    • How to create a DR plan for the VMware target cloud

      Task Create a DR plan for the VMware target cloud. Solution This an essential step taken in advance when planning your strategy for a possible failover of selected machines to the target cloud and eventual disaster recovery. The DR plan is the ...
    • How to set orchestration for a failover or migrations

      Task Set orchestration for a failover or migrations Solution To set orchestration settings, change the parameter "Rank" and add the parameter "boot_condition". It can be done in the Expert tab while editing the DR plan. Rank Order in which a group of ...
    • How to set a rank to my server in the DR or Migration Plan

      To set a rank change the parameter Rank. It can be done in the Expert tab while editing the DR plan. In this example the machine WS2012R2 will start only after the machine ubuntu1604 starts.
    • How to set a boot condition to my server

      Task Set a boot condition to a server. Solution To set a boot condition, add the parameter "boot_condition". It can be done in the Expert tab while editing the DR plan. Example: "boot_condition": {        "delay_seconds": 300,        "type": "wait" ...
    • Initial replication of large machines using Direct Attached Storage for Windows Replication Agent

      Challenge Some machines that should be replicated to set up migration or disaster recovery process exceed the capabilities of customer's network connection in terms of machine size / network bandwidth. Completing initial replication of a 50Tb machine ...